USS   Sinclair
  • About Us
    • Technical
    • Join
    • FAQ
    • Links
    • Disclaimer & Privacy Policy
  • Our Crew
    • Sections
    • Ranks
    • SFMC
    • Chapter Awards
  • Calendar
  • Contact Us

Constructing the U.S.S. Sinclair - Project Sinclair

2372 - Proposal Accepted from Starfleet Operations to build several new Defiant Class Escort Cruisers. Minor changes to the Defiant blueprints made to suit the Sinclair's purposes. (The project name is Project Sinclair, so the vessel is unofficially called the Sinclair.) Name and NCC number application made to Starfleet Department of Technical Services. Materials for main space-frame were obtained, and Third-party System Contractors begin working on their respective (as indicated above) system(s).

2373 - Blueprints for the Sinclair completed. Space-frame started. Preliminary stress-tests of space-frame conducted.

2374 - Space-frame completed, and full stress-tests conducted of completed frame. Test results were impressive, and the Starfleet Inspection was passed. Propulsion systems completed by Shuvinaljis Warp Technologies and installed. Power Transfer Conduits (PTC) are added for the Warp Drive, Phasers, Phaser Cannons, Torpedo Launchers, Main Deflector, Sensor Arrays, and Tractor Beams.

2375 - Phaser, Phaser Cannon, Torpedo Launcher, Main Deflector, Warp Core, Sensor Arrays, Impulse, and Thruster systems installed. Testing of the Warp Core begins. Exterior Duranium Alloy plates start being attached to the space-frame.

2376 - Testing of all main systems begin. Optical Data Network (ODN) fully installed. Corridors and smaller rooms (such as crew quarters) are started and completed. Starfleet Department of Technical Services approves the name U.S.S. Sinclair and registry NCC-74209 as it's official designation. Engineering, Bridge, Sickbay, Science, and Marine Bays are completed.

2377 - Main Computer is installed and tied in to all terminals and stations throughout the Sinclair. All vessel secondary, backup, and emergency functions are tested for Starfleet Certification. Primary 
Systems Certification testing are also started.

2378 - Primary Systems testing completed. Starfleet Inspectors conduct Certification testing of all primary, secondary, backup, and emergency systems. All Certifications are passed.

07/15/2378 - The U.S.S. Sinclair NCC-74209 is officially commissioned for duty under the Command of Cmdr. Joseph Sare and Lt. Cmdr. Jerry Diehl. The Sinclair's maiden voyage also made on this date.

Picture
Starship Class: Defiant Class Escort Cruiser

Displacement: 355,000 mt

Overall Length: 119.48 m

Overall Draft: 21.07 m

Overall Beam: 93.88 m



Propulsion
Two LF-35 Mod 1 energized-energized antimatter warp drive units (System Contractor: Shuvinaljis Warp Technologies, Vulcan)
Two FIG-2 Subatomic unified energy impulse units
(System Contractor: Kloratis Drives, Tellar)
QASR-2 particle beam maneuvering thrusters (System Contractor: Scarbak Propulsion Systems, Earth)

"Trentis IV" pulsed laser reaction control system (System Contractor: Orage Ijek, Aksajak, Andor)


Velocity
Warp 6 - Standard Cruising Speed
Warp 8 - Maximum Cruising Speed
Warp 9.982 - Maximum Attainable Velocity

Mission Duration
5 years (Standard)


Crew Compliment
10 Officers
30 Enlisted
0 Passengers (Normal - Up to 100 maximum)
40 Total Crew (Standard)

Embarked Craft
None

Navigation
RAV / ISHAK Mod 3 Warp Celestial Guidance
(System Contractor: Tlixis Ramab RRB, Coridan III)

Computers
M-15 Isolinear III with LCARS
(System Contractor: Daystrom Computer Systems, Luna)

Phasers
4 Type XII Pulse Phaser Cannon
(System Contractor: HiBeam Energies, Earth)
2 Type X Collimated Phaser Array
(System Contractor: HiBeam Energies, Earth)

Missles
3 MK 75 Photon Torpedo Launchers
(System Contractor: Skat-Rar Weapon Systems, Andor)

Defense
FSQ Primary Force Field
(System Contractor: Charlottes Shields, Earth)

Life Support
MM6 Modular Gravity Unit
(System Contractor: Morris Magnatronics, Palyria, Mars)
AL4 Life Support System
(System Contractor: A'Alakon Landiss, Divallax, Andor)

Main Computer
Classified

Powered by Create your own unique website with customizable templates.